Home » Product » EMP Protection » EMP Design & Build Process
Our Comprehensive EMP Protection System Design & Build Process
EMP Protection System
ERETEC has successfully carried out EMP business based on the know-how accumulated from EMC system supply and installation.
As a construction infrastructure, EMP protection project requires E.P.C (Engineering and Procurement Construction) and ERETEC provides a variety of solutions to meet customers’ demands using design capabilities and project management skills.
▪ EMP Design & Build Process
| Process | Engineering and Procurement Construction | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Analysis | Basic Design | Detail Design | Procurement | Construction | Performance Test | Acceptance Test | As-Built | ||
| Analysis | RFP, Customer requirement, Latest technical trend analysis | ||||||||
| Basic Design | Define the objects to be protected - Decide critical POE – Finalize EMP protection specification – Basic design work | ||||||||
| Detail Design | EMP Protection design – Verification method – Operation manual – Technical Description – Specification Writing - Price estimation – Detail design | ||||||||
| Procurement | Material procurement refer to approval drawings / Steel, Shielding, utilities , etc. | ||||||||
| Construction | Quality Control Procedures – Construction Planning – Safety Measure – Proceed construction | ||||||||
| Performance Test | Acceptance Test & Verification Test (SE/PCI/SELDS) by authorized test organization. (SE / PCI / SELDs) | ||||||||
| Acceptance Test | Operation Plan, Training, Network, Handover | ||||||||
| As-Built | Supervisor’s final approval and as-built inspection | ||||||||
▪ WBS (Work Breakdown Structure)
EMP Shielding
Other Facilities
Authorized Test
Level 0 : EMP PROJECT
- Level-1
- EMP Shielding
- 1.1 Structural POEs
- 1.2 Electrical POEs
- 1.3 Mechanical POEs
- Level-2
- Communications / Electronics
- 2.1 Communications / Electronics
- 2.2 Distribution Board / Facility Grounding
- 2.3 UPS / Generator Installation
- Level-3
- Mechanical Facility
- 3.1 HVAC System
- 3.2 Fire Protection / Earthquake Resistance
- 3.3 Chemical Biological Protection Facility
- Level-4
- Performance Test
- 4.1 SE Test
- 4.2 PCI Test
- 4.3 SELDS Test
- Level-1
- EMP Shielding
- 1.1 Structural POEs
- 1.2 Electrical POEs
- 1.3 Mechanical POEs
- Level-2
- 전기/통신 설비
- 2.1 전기/통신 장비 구성
- 2.2 수배전반/시설접지 설치
- 2.3 UPS/발전기 설치
- Level-3
- 기계 설비
- 3.1 공조 설비
- 3.2 소방/면진 설비
- 3.3 화생방 방호설비
- Level-2
- Communications / Electronics
- 2.1 Communications / Electronics
- 2.2 Distribution Board / Facility Grounding
- 2.3 UPS / Generator Installation
- Level-3
- Mechanical Facility
- 3.1 HVAC System
- 3.2 Fire Protection / Earthquake Resistance
- 3.3 Chemical Biological Protection Facility
- Level-4
- Performance Test
- 4.1 SE Test
- 4.2 PCI Test
- 4.3 SELDS Test