Our Comprehensive EMP Protection System Design & Build Process

EMP Protection System

ERETEC has successfully carried out EMP business based on the know-how accumulated from EMC system supply and installation.
As a construction infrastructure, EMP protection project requires E.P.C (Engineering and Procurement Construction) and ERETEC provides a variety of solutions to meet customers’ demands using design capabilities and project management skills.

▪ EMP Design & Build Process

Process Engineering and Procurement Construction
Analysis Basic Design Detail Design Procurement Construction Performance Test Acceptance Test As-Built
Analysis RFP, Customer requirement, Latest technical trend analysis
Basic Design Define the objects to be protected - Decide critical POE – Finalize EMP protection specification – Basic design work
Detail Design EMP Protection design – Verification method – Operation manual – Technical Description – Specification Writing - Price estimation – Detail design
Procurement Material procurement refer to approval drawings / Steel, Shielding, utilities , etc.
Construction Quality Control Procedures – Construction Planning – Safety Measure – Proceed construction
Performance Test Acceptance Test & Verification Test (SE/PCI/SELDS) by authorized test organization. (SE / PCI / SELDs)
Acceptance Test Operation Plan, Training, Network, Handover
As-Built Supervisor’s final approval and as-built inspection

▪ WBS (Work Breakdown Structure)

EMP Shielding
Other Facilities
Authorized Test

Level 0 : EMP PROJECT

Level-1
EMP Shielding
  • 1.1 Structural POEs
  • 1.2 Electrical POEs
  • 1.3 Mechanical POEs
Level-2
Communications / Electronics
  • 2.1 Communications / Electronics
  • 2.2 Distribution Board / Facility Grounding
  • 2.3 UPS / Generator Installation
Level-3
Mechanical Facility
  • 3.1 HVAC System
  • 3.2 Fire Protection / Earthquake Resistance
  • 3.3 Chemical Biological Protection Facility
Level-4
Performance Test
  • 4.1 SE Test
  • 4.2 PCI Test
  • 4.3 SELDS Test
Level-1
EMP Shielding
  • 1.1 Structural POEs
  • 1.2 Electrical POEs
  • 1.3 Mechanical POEs
Level-2
전기/통신 설비
  • 2.1 전기/통신 장비 구성
  • 2.2 수배전반/시설접지 설치
  • 2.3 UPS/발전기 설치
Level-3
기계 설비
  • 3.1 공조 설비
  • 3.2 소방/면진 설비
  • 3.3 화생방 방호설비
Level-2
Communications / Electronics
  • 2.1 Communications / Electronics
  • 2.2 Distribution Board / Facility Grounding
  • 2.3 UPS / Generator Installation
Level-3
Mechanical Facility
  • 3.1 HVAC System
  • 3.2 Fire Protection / Earthquake Resistance
  • 3.3 Chemical Biological Protection Facility
Level-4
Performance Test
  • 4.1 SE Test
  • 4.2 PCI Test
  • 4.3 SELDS Test